Results for "development test/operation test"
- DT/OT: development test/operation test
- DOT&E: Development and operation test & evaluation
- TO: Test Operation
- RTO: Required test of operation
- TOP: Test Operation Process
- IOT: Integration Operation Test
- TOPs: Test Operation Procedures
- OTA: Operation Test Agency
- OT&E: Operation Test & Evaluation
- IOT: Individual Operation Test
- OAT: Operation Acceptance Test
- NTO: Nevada Test Operation
- SOT: Satisfactory Operation Test
- TON: Test Operation Notice
- DCT: Dyadic Co-operation Test
- TOC: Test Operation Center
- TSO: Test Suit Operation
- AOT: Aircraft Operation Test
- TOP: Test Operation Procedure
- OTA: Operation Test Authority
- SOT: Single Operation Test
- MTO: Mississippi Test Operation
- LOT: Limited Operation Test
- T&O: Test and Operation
- OAT: Operation Assessment Test
- OTP: Operation Test Piece
- SOT: Systems Operation Test
- ORT: Operation Readiness Test
- OMT: Operation Maintenance Test
- FOT: Field Operation Test
- PTO: Peebles Test Operation
- DTO: Drug Test Operation
- OST: Operation Stress Test
- SOT: System Operation Test
- PTO: Power Test Operation
- OTC: Operation Test Command
- ITO: Inspection, Test, and Operation
- GTOS: Game Test & Operation Service
- IOTE: Initial Operation Test & Evaluation
- OTRR: Operation Test Readiness Review
- SOVT: System Operation Verification Test
- JOTS: Joint Operation Test Site
- TOAA: Test Operation and Analysis
- ITO: Inspection, test and operation
- POST: Pre Operation System Test
- UTOPIA: Universal Test and Operation
- DSOT: Daily System Operation Test
- DTOC: Distributed Test Operation Center
- T&FO: Test and Facilities Operation
- DSOT: Daily Systems Operation Test
- SHOW MORE